NWE - INTERREG IV B
amice logo

AMICE

Climate Changing? Meuse Adapting!

Région Wallonne (GTI)



Service Public de Wallonie – DGO2 – DO223 – GTI – rez de chaussée, Boulevard du Nord, 8


5000 Namur
Belgium, Wallonia
phone :
fax : 32 (0)81 77 37 88
website : voies-hydrauliques.wallonie.be/
Back to partners list

Les actualité du partenaire :

  • Site visit - Ny village and the Naives plain - Belgium
  • Work Package 1 starts !
  • AMICE officially approved
  • First Project Steering Group meeting
  • Project Steering Group meeting report - First Payment Claim
  • WP2 Partners share experience
  • WP2 Partners share experience
  • WP2 Partners share experience
  • First ERDF subsidy received by AMICE project
  • Natural water retention in the Ardennes
  • First edition of AMICE newsletter
  • WorkPackage 1 follow-up meeting
  • Meuse Symposium - the AMICE session
  • Project Steering Group 3 - meeting report
  • WP4 report on Flood crisis management in the Meuse basin
  • WP4 report on Flood crisis management in the Meuse basin
  • WP4 report on Flood crisis management in the Meuse basin
  • WP4 report on Flood crisis management in the Meuse basin
  • WP4 report on Flood crisis management in the Meuse basin
  • Second issue of Meuse and Climate !
  • AMICE Site Visit on Amel Amblève
  • Report of the last WP4 meeting
  • WP1 report on the Analysis of climate change, high-flows and low-flows scenarios on the Meuse basin
  • Summary : Analysis of climate change, high-flows and low-flows scenarios on the Meuse basin
  • Presentation of the hydraulic modelling results
  • SICadapt! Cluster Kick-off
  • WP4 Meeting
  • Third issue of Meuse and Climate
  • Project Steering Group 5
  • Kick-off Seminar for the Transnational flood crisis management Exercise
  • Cluster Website and Expert Board
  • Site Visit on the Rur reservoirs
  • WP3-WP2 joint meeting
  • WP1 updates
  • Information sharing on the organisation of national flood exercises
  • Meuse and Climate 4 presents the AMICE project s latests activities
  • Full hydraulic modeling of the Meuse basin
  • Project Steering Group 8
  • Transnational flood crisis management exercise
  • Meuse and Climate 5
  • AMICE final conference : in preparation
  • climate impacts and climate proofed measures
  • Project Steering Group n.7
  • Feedback on the Walloon and French flood exercises
  • First Workshop for the definition of AMICE Adaptation Strategy to Climate Change
  • Second workshop for the definition of AMICE Adaptation Strategy to Climate Change
  • Flood exercise demonstration in The Netherlands
  • AMICE Project Steering Group n°8
  • Costs of climate-change-induced floods in 2050 and 2100
  • Lessons learnt from the AMICE investments
  • Report on workshops for the Meuse adaptation strategy to climate change
  • Wonder how the activities along the Meuse could be influenced by climate change ?
  • Groupe Transversal Inondations (GTI) – Région Wallonne

    About

    Tasks in the AMICE project

    WP1:

    - provide data for the bibliography (data needed on the Meuse in Wallonia),

    - produce international maps needed for the AMICE project: maps of future damages caused by floods and low-flows (Action 2)

    - provide data for the hydraulic modelling of the river Meuse

    - provide data for economical risk calculation

    - provide data for climate-check of existing measures in water management

    - participation in the meetings and decision makings of the WP1

     
    WP2: support town of Hotton 

    WP4: support APS 

    The Région Wallonne (GTI) is member of the International Meuse Commission and will participate to the sharing of works between AMICE and the Commission.